Desert Joy 2, Tunesia
- CE Water Solutions

- 17 feb
- 1 minuten om te lezen
Bijgewerkt op: 25 feb
Location | El Hamma, Tunesia |
Activity | Tomatoes |
Size | 48 Ha - glass greenhouse |
Case | Since 2025, operational on 10 sources, 4x irrigation and 4x drain, and 2x treated drain. Weekly all sources are measured 3 times. |
Platform | Measurements are scheduled on fixed times during the week. Data visibility with CE-Line dashboard. |
"
Water analysis and the logistics in Tunesia are complex. We have to wait more than a week before the data is available. Running a large and expanding, greenhouse requires a higher frequency of crucial data to manage the plant growth and crop quality. With CE-Line we have the nutrient data of a source available on the day we want to know. This makes our decision making on water and nutrient management easier and more optimised to plant demand. Next to that the lab costs are reduced greatly.
Alaa Edine Chairet
Director Desert Joy